Sustainable, because the building remains

The most sustainable building is often the one that is already standing. Schanzenstraße 24 is being refurbished rather than replaced, and brought up to today's technical standards. Over 50 years, it will cause 43% less CO₂ than a comparable new build.

View through a large skylight to the sky

Keeping a building is the biggest climate lever

Giving an existing building a new use, rather than demolishing it and building anew, saves more CO₂ than any other measure. The deciding factor is that the building stays.

Regulations and certificates mainly look at operational carbon, the energy used while a building is in operation. That favours new builds. The question of whether to demolish and rebuild at all is skipped.

That is why we argue for looking at the whole picture: embodied and operational carbon together, over the entire life of a building.

Brick piers and render panels with rosettes between timber windows

Four terms, briefly explained

  • Adaptive reuse

    Giving an existing building a new function while preserving its architectural core.

  • Operational carbon

    The emissions from energy used in operation: heating, cooling, lighting.

  • Embodied carbon

    The emissions from materials: up front for construction, and during use for renovation and maintenance.

  • Whole life-cycle carbon

    Everything together, embodied and operational, over the entire life of a building. We assume 50 years.

The result for Schanzenstraße 24

A life-cycle assessment by Agradblue compares the reuse of Schanzenstraße 24 with a hypothetical new build of the same use, size and standard.

less CO₂ over 50 years than the new build
43%
less CO₂ per year
around10,600kg
in an average petrol car: that is how much CO₂ it saves every year
around60,000km

Why the saving is so large

Schanzenstraße 24 is an existing office building from 1906. We are refurbishing the roof, the building services (air-source heat pump), the insulation and the interior. What carries and defines the building stays.

A new build in its place would be a carbon-intensive reinforced-concrete building. The heavier the existing building, the more CO₂ is already locked into it, and the more you save by keeping it.

Brick façade with windows above the sandstone base

Reuse or new build: when the CO₂ is emitted

Share of the construction phase in total emissions over 50 years. With a new build, most of it is emitted before anyone has even moved in.

reuse of Schanzenstraße 24
around25%
comparable new build
around60%

What else the analysis shows

  • Efficient operation is not enough

    New builds often use less energy once completed. But because up to 60% of their emissions occur during construction, their overall balance remains higher. With an upgraded façade and building services, a reused building can keep up on energy use.

  • Even the most efficient new build cannot catch up

    Even a new build that runs 30% more efficiently than comparable new builds does not match the overall balance of reuse.

  • Demolition not yet included

    Demolishing the existing building is not included in the calculations.

Energy and climate

What we are doing at Schanzenstraße 24.

  • Heat from a heat pump

  • Ceiling heating and cooling

    around 20 °C in winter and 26 °C in summer, slightly warmer during heat waves

  • Automatic fresh-air ventilation in all offices

  • Around 30 solar panels on the roof supply part of the building's general electricity

  • LED lighting that switches on and off according to occupancy

  • Target

    BREEAM In-Use certification rated "Very Good"

What we preserve

The listed elements of Schanzenstraße 24 are preserved and restored: the façade, the staircase and the historic meeting rooms.

They are the reason why keeping the building is worthwhile: for the climate and for everyone who works here.

Moulded plaster arch in the staircase

Mobility

  • 4 EV charging points at two double charging stations

  • At least one accessible parking space

  • E-bike charging in the courtyard

  • Light rail line 4, Keupstraße stop, around 5 minutes' walk

Building technology

  • Fibre broadband from NetCologne

  • Power and network at every workplace

  • Accessible lift to all floors

  • Floor load of 2 kN/m² from the ground floor to the attic floor

  • Fire alarm system, emergency lighting, video intercom

Frequently asked questions

Are there EV charging points?

Yes. There are four EV charging points at two double charging stations, as well as e-bike charging in the courtyard.

Is an old building worse for the climate than a new one?

No, the opposite is true. Because the existing structure is retained, Schanzenstraße 24 will cause 43% less CO₂ over 50 years than a comparable new build.

Is the building certified?

Not yet. The target is BREEAM In-Use certification with a "Very Good" rating.

Does sustainability play a role in your choice of location? We will be pleased to send you further details.

Getting here

on foot from light rail line 4, Keupstraße
On foot
5 min
Plan your route
stops right on Schanzenstraße
Bus and rail
Bus 150
Plan your route
by bike to Köln-Mülheim station (S6, S11)
By bike
5 min
Plan your route
by car to Deutz and the trade fair
By car
10 min
Plan your route